Risk register template

Track risks with likelihood, impact, owner and mitigation

Start with this template →Sign in

Opens on reph with the template ready to start. No account needed; sign in to keep your document.

Use it when

A project, launch or program has enough moving parts that risks need named owners and a regular review, not a list in someone's head

Who it's for

ManagerOperationsProduct manager

Filled example

The template filled in for a made-up company, so you can see what good looks like.

Carewell clinic app launch risk register

Author: Owen Castellanos · Date: 2026-08-14

Summary

Open risks
6
▼ -2
High (15+)
1
▼ -1
Mitigations overdue
1
▲ +1

Scoring legend

Score Meaning
1-5 Low: monitor
6-14 Medium: mitigate
15-25 High: active plan, exec visibility

Register

ID Risk Likelihood Impact Score Owner Mitigation Status
R1 App store review flags health-data permissions, delaying launch past Sept 15 4 4 16 Mia Torres Submit a TestFlight build for pre-review on Aug 20; prepare a reduced-permission fallback build Open
R2 EHR vendor sandbox is unstable, so integration tests are flaky and real bugs slip through 3 4 12 Dev Patel Record vendor responses and replay them in CI; weekly call with vendor support Open
R3 Clinic front-desk staff are not trained before go-live, causing check-in queues 3 3 9 Grace Lin Two training sessions per clinic in the week before launch Open
R4 Push notification provider rate limits during appointment reminders at 8am 2 3 6 Dev Patel Stagger reminders across a 30-minute window Open
R5 Accessibility audit finds blocking issues late 2 4 8 Mia Torres Audit booked for Aug 25; fixes budgeted in sprint 18 Open, mitigation overdue (audit slipped once)
R6 Key iOS engineer on leave in September 2 2 4 Owen Castellanos Pair-handover in August Open

Closed risks

ID Risk Resolution Closed date
R7 HIPAA BAA with hosting provider not signed Signed by legal on Aug 6 2026-08-06
R8 Design system not ready for dark mode Dark mode moved out of launch scope 2026-08-09

Review log

Date Reviewer Notes
2026-07-31 Owen, Mia, Dev Initial register, 8 risks
2026-08-14 Owen, Mia, Dev, Grace Closed R7 and R8, R1 escalated to the COO, R5 audit date slipped

The template

Show the blank template

Risk register

Author: [your name] · Date: [date]

Summary

Refresh these at each review. The trend is the story: is exposure going down?

Open risks
0
▲ 0
High (15+)
0
▲ 0
Mitigations overdue
0
▲ 0

Scoring legend

Likelihood × Impact, each 1 (low) to 5 (high). A score above 15 should have a named owner and an active mitigation, not just a row.

Score Meaning
1-5 Low: monitor
6-14 Medium: mitigate
15-25 High: active plan, exec visibility

Register

Write each risk as cause, event, effect. One owner per risk.

ID Risk Likelihood Impact Score Owner Mitigation Status
R1 Open

Closed risks

Keep resolved risks visible. It shows the register is actually maintained, not a graveyard nobody revisits.

ID Risk Resolution Closed date

Review log

When this register was last reviewed and by whom. A risk register that's never revisited is decoration.

Date Reviewer Notes

Questions

How often should it be reviewed?
Every two weeks for an active project, and before any go or no-go decision
What makes a good risk statement?
Cause, event and effect, for example a vendor delay causes a missed launch date
When do we close a risk?
When it can no longer happen or has happened and moved to an issue log

Fill it with your agent

Connect Claude to reph over MCP, then paste this. The draft arrives as suggestions you accept or reject section by section. How to connect Claude.

Find my reph doc "Risk register" with search_docs, then read it with read_doc. Propose new or updated risks from the project plan, recent status updates, incident notes and open blocker tickets I point you to, each scored with a suggested owner and mitigation, and refresh the summary numbers. File it with suggest_edit, one replace_section op per section (heading line kept) so each can be accepted alone. Ask each open question (uncertain scores, risks with no clear owner) with add_comment quoting that section's heading line, then call request_review with a one-line summary.